Home › Terminal
Terminal
Warning: count(): Parameter must be an array or an object that implements Countable in /home/nortermi/public_html/wp-content/plugins/q-and-a/inc/functions.php on line 252
Norterminal will be designed for efficient and safe operations according to the highest international API standards.
- Will include systems for vapor recovery to eliminate emissions / Air pollution.
- Will build and operate a wastewater handling system.
- Will require terminal staff of 60 – 110 people based on operating 24/7.
- Estimates are based on an expected oil throughput of 10 to 21 million tons per year.
- Throughput will equate to 150 -300 ship calls per year, and will require 2 tugboats per ship call (Tugboat company expected to establish local presence).
- Can facilitate all necessary infrastructure required for local Oil spill response: Staff, boats, equipment, logistics management: OSR may increase with higher activities and require new local base.
Conceptual description and equipment layout